This was a challenging project requiring four extremely large Barrel Vault Gantrys and one main Dome Gantry.
All the Gantrys were (as is generally the case) of bespoke design in mild steel sections and all more than 20m in length. …
All the Gantrys were (as is generally the case) of bespoke design in mild steel sections and all more than 20m in length. …
Nearing completion, this successful project included a 9m fixed jib BMU running on twin steel tracks and fixed to the structural steel roof. The track arrangement included a points system to enable the BMU to be parked away from the …
Atrium Gantrys secure another BMU project.
Design Work has now been completed in house and fabrication is underway to an extremely tight programme. Atrium Gantrys has worked with the Main Contractor to design the BMU and track system to incorporate …
The Latest Project to be secured by Atrium Gantrys is for a BMU with a 14m double telescopic and luffing jib. As usual Atrium Gantrys incorporate their own designed and manufactured Power Pack unit which includes a grooved double drum, …