Nearing completion, this successful project included a 9m fixed jib BMU running on twin steel tracks and fixed to the structural steel roof. The track arrangement included a points system to enable the BMU to be parked away from the building edge out of sight when not in use. Within the Atrium we installed a Beam Gantry so that a Cradle can be suspended to access the vertical walls of the Atrium. We also supplied a series of Mansafe and Handrail systems to various levels to the Building.