This recent project in London required access to the façade of the building by abseiling technique.
Atrium Gantrys designed manufactured and installed a continuous walkway around the full periphery of the building with a rear handrail and a front tubular abseil rail at the parapet level.
We also provided a travelling davit unit for glass lifting purposes which was designed to run on the abseil rail and the lower track doubled as a kick plate to the walkway. With three access stairs spaced out around the walkway to complete the installation.